HYDROELECTRIC POWER PLANTS - BISTRICA RIVER
On the basis of a concluded Contract between the ГИМ Геотехника – Banja Luka, and the China National Aero Technology International Engineering Corporation – Branch Foča
Read more >MEDOSH DAM (BOSNIA AND HERZEGOVINA)
ГИМ was in charge of the construction of the инекциона curtain of the dam Медош in bosnia and Herzegovina, which
Read more >RESIDENTIAL - BUSINESS FACILITY
Department of civil engineering Institute Macedonia - ГИМ, and through its branch office in Montenegro, LLC "Construction Инситут Монтенегро" was started by the construction activities, the Building of a place to live – business facility, located on the Урбанистичките parcel Ц3 and Ц4, New Town, Podgorica, and the CP 3487/1 and CL 3487/2.
Read more >CEIM performed investigative geotechnical works and installation of inclinometers as well as new landslide monitoring in Grdelica Gorge. The main Contractor in the project is Integral Engineering.
Read more >In the Moravian Corridor, Section Pojate - Preljina with a length of 110 km, CEIM was in charge
Read more >So far, CEIM Geotechnics has drilled more than 13,000 meters within the project implemented in Lopare, near Zvornik, Bosnia, and Herzegovina.
Read more >CEIM has been a Consultant to STRABAG, a Contractor who reconstructs the M2 road, section Rozaje - Spiljani in Montenegro.
Read more >CEIM is part of the project for reconstruction of the highway M18 Section Podgorica-Danilovgrad.
Read more >The Bechtel&Enka, with the Government of the Republic of Serbia, at the end of the 2019 year. signed a contract for the construction of a modern highway Појате – Чачак, with a total length of about 110 km
Read more >On the side of the Artist of the work Integral Inženjering, in the period of 2015 – 2020 period.
Read more >CEIM performs geological investigation works in Varesh (Bosnia and Herzegovina), where Eastern Mining LtD Tisovci Varesh appears as Investor.
Read more >CEIM performs several projects within the Operational coast Volujica as integral part of Luka Bar in Montenergro.
Read more >The extension of the terminal is designed for medium sized cruise ships (for 400 m) in Bar, Montenegro, where Luka Bar appears as Investor.
Read more >VISHEGRAD BOSNIA AND HERZEGOVINA
CEIM performed rehabilitation works for control of the leakage waters under the body of Vishegrad Dam (Bosnia and Herzegovina).
Read more >In the period from 2017 to 2018 year испроектиран is a residential complex that is a part of a residential zone in Podgorica, where, as an Investor it serves the Union of the Ministry of internal affairs in the Republic of Montenegro.
Read more >Design for improving the water balance of the reservoirs Krupac (Montenegro).
Read more >In the period from 2015 to 2016, the Detailed design was realized for Semi-open Warehouse for storing incoherent material in Bar, Montenegro, where Luka Bar appears as Investor.
Read more >CEIM performed a deep exploratory well in Slatina spa – Laktashi (Bosnia and Herzegovina).
Read more >On November 7, 2012, CEIM started working on the rehabilitation of the injection curtain on the Spilje dam.
Read more >