Градежен институт Македонија успешно ја одигра улогата на надзорен орган на повеќенаменскиот комплекс „Diamond of Skopje“, кој го ревитализира центарот на Град Скопје.
CEIM cooperated with the Austrian company STRABAG as a current laboratory during the construction of the expressway Stip-Radovish.
CEIM made cooperation with the Spanish company RUBAU as a current laboratory during the construction of the expressway Farish - Drenovo.
CEIM performs geological investigation works in Varesh (Bosnia and Herzegovina), where Eastern Mining LtD Tisovci Varesh appears as Investor.
CEIM performs several projects within the Operational coast Volujica as integral part of Luka Bar in Montenergro.
The extension of the terminal is designed for medium sized cruise ships (for 400 m) in Bar, Montenegro, where Luka Bar appears as Investor.
CEIM performed rehabilitation works for control of the leakage waters under the body of Vishegrad Dam (Bosnia and Herzegovina).
Во периодот од 2017 до 2018 година испроектиран е станбен комплекс кој е дел од станбена зона во Подгорица каде како Инвеститор се јавува Синдикат...
Design for improving the water balance of the reservoirs Krupac (Montenegro).
Во периодот од 2015 до 2016 година реализиран е основен проект за Полуотворен магацин за складирање на растресит материјал во Бар, Црна Гора во кој...