CEIM was in charge of the grout curtain construction on the Medosh dam in Bosnia and Herzegovina, which included grout works on several sections of the curtain with a depth of up to 40m with a combined exit-downflow method. The grout works took place internally in the grout gallery and externally along the sides of the concrete dam to improve the anti-filtration characteristics of the barrier site and provide better stability.