MEDOSH DAM (BOSNIA AND HERZEGOVINA)

CONSTRUCTION OF A GROUT CURTAIN ON MEDOSH DAM (BOSNIA AND HERZEGOVINA)

CEIM was in charge of the grout curtain construction on the Medosh dam in Bosnia and Herzegovina, which included grout works on several sections of the curtain with a depth of up to 40m with a combined exit-downflow method. The grout works took place internally in the grout gallery and externally along the sides of the concrete dam to improve the anti-filtration characteristics of the barrier site and provide better stability.

en_US