The hydroelectric power plant Globochica is part of the hydropower system HPP Crn Drim, and it started operation
The Laboratory Department within CEIM is preparing to start work as a field laboratory in concrete and geomechanics during the reconstruction
CEIM cooperated with MG FASHION LLC as an ongoing laboratory during the construction of the Grand Skopje complex
The hydropower plant Sapunchica uses the waters of several smaller watercourses and the Sapunchica River
CEIM is engaged in the implementation and performs ongoing control of the embedded materials during the construction of the BLISS shopping center in Bitola.
CEIM is part of the long-term project for Energy Efficient Rehabilitation of nine student dormitories in Skopje, Prilep, Bitola
CEIM is in charge of creating technical documentation for redesigning the quay on the Vardar River, where the focus is on finding new opportunities to activate the surrounding space and integral connection.
For the requirements of the world-famous Wabtec corporation, CEIM is creating a Detailed Design for a new factory
The Investor SOYAK ENERJİ TİCARET from Istanbul (Turkey) and APEX ENERGY LTD Skopje within the project framework plan to construct a wind farm (WF) Ramno 1
The newly designed structure for an administrative building is in the Technological Industrial Development Zone Shtip