The recovery of the pipeline from a T3 RACK-Bitola to b.Suvodol
CEIM and BV Engineering DOOEL Bitola started with the realization of the project for rehabilitation of the pipeline from T3 REK Bitola to Suvodol.
The rehabilitation of the pipeline from T3 REK Bitola to Suvodol with a length of 5,155.57 meters, includes the rehabilitation of a landslide zone with a total length of 337 meters through which the route of the pipeline passes.
This project is one of the most important capital projects for REK Bitola.