The second tunnel under the Preseka pass was drilled
On March 15, in the presence of the employees engaged in the construction of the highway Kicevo - Ohrid, the second tunnel under the Preseka pass was drilled, where CEIM is a supervisor in the project.
The second tunnel has a length of 2,011 meters, which is also the longest road tunnel built in the country, and the total length of the two tunnel pipes is 4,015 meters.