The Laboratory Department within CEIM has been working for a year as a field laboratory in the field of concrete and geomechanics during the construction of the state road A2, Dlabochica - Stracin section at the express road level as part of the Corridor VIII with a total length of approximately 15 km. The Design foresees the construction of many structures, or a total of 5 bridges, 8 overpasses, and 27 culverts. The Design Contractor is STRABAG AG. - Skopje.