LUKA BAR MONTENEGRO

LUKA BAR MONTENEGRO

CEIM performs several projects within the Operational coast Volujica as integral part of Luka Bar in Montenergro.

During the realization of the projects, in September 2012, a report was made for the detailed recording and assessment of the bearing and stability of the structure of the operational coast.

In 2019, Detailed Design is additionally created for rehabilitation and strengthening of the bearing structure of the operational coast, as annex to the previously prepared report.

All solutions defined in the project are supported with appropriate static-seismic analysis and appropriate bill of quantities and calculation of the cost for the rehabilitation. The Design is audited and accepted by the Investor JSC Luka BAR.

The Design Department of CEIM works on the Detailed Design for extending the operational coast for additional 166 meters.