CEIM performed rehabilitation works for control of the leakage waters under the body of Vishegrad Dam (Bosnia and Herzegovina).
In more details, it is a construction of deeper exploratory wells performed for filling the channels through which the water was lost in the reservoir, after which grouting was performed.
This Contract was realized in 2013 and 2014, followed by a new contract in 2016-2018 under which the grouting works on Vishegrad Dam were completed.