HPP SAPUNCHICA

HPP SAPUNCHICA

The hydropower plant Sapunchica uses the waters of several smaller watercourses and the Sapunchica River, and it started operation in 1952. The Main Intake is 6.5 km upstream of the river to the machine building. The subject of the processing is the report from the Inspection of a supply channel, which is rectangular with a concrete bottom, cover slab, and side (wing) walls made of stone masonry in mortar, in which CEIM is the Executor.